Construction Updates by Building
(links marked with * are .pdf and require Adobe Reader)

Building 1 | Building 2 | Building 3 | Building 4 | Building 5 | Building 6 | Building 7 | Building 8 | Building 9 | Building 10 | Building 11 | Building 12 | Building 13 | Building 15 | Building 16 | Building 17 | Building 18 | Building 19 | Building 24-27 | Center | Airport | Downtown Campus Building | Florence Center | Parking Lots | Solar Station | Track and Soccer Bowl

Building 1

December 15, 2009
BOND UPDATE: BUILDING 1 DATA CLOSET REMODEL
LA Kersh Architects produced a design for a data closet remodel in Building 1 and bid proposals for the work will be requested from interested contractors. Contact Dave Smith, 3433.

August 31, 2009
PROJECT 451 UTILITY SUBMETERING

Completed meter installations this week: water meters for buildings 1, 2, and 5; electrical meters for buildings 1, 2, 3, 4, 5, 6, 7, 11, 18, 19, 24, 25, 26, and 27. Main building isolation valve replacements this week: domestic cold water in buildings 4, 5, and 6. In addition, eight water main valves were replaced. Contact Angela Fazio, 463-3428.

August 17, 2009
PROJECT 448 KEYLESS ACCESS

Allied Fire & Security continued work in building 1 Student Services, building 9 Auto/Diesel and Child Care buildings 24-26. Meetings with individual departments will continue for several weeks until all the campus buildings have been reviewed and requirements established. Contact Dave Smith, 463-3433.

PROJECT 451 UTILITY SUBMETERING
EMK has been working aggressively on installing gas and water meters on campus. Most of the irrigation meters and some meters in the tunnel have been installed. Due to late material shipments, the shutdown schedule for buildings 1, 2 and the Center building will be revised. A modified schedule will be sent later this week. Contact Mark Richardson, 463-3426.

PROJECT 452 ELECTRICAL UPGRADES
Replacement of old and obsolete electrical panels by LCC deferred maintenance electricians is on hold while more time critical projects such as classroom upgrades are being completed. It is anticipated the panel replacements will resume during the shutdown August 22-23 and then again after the beginning of classes in September. An electrical transformer serving building 1 has been found to contain high levels of gases due to an internal arcing condition. It is of concern to campus Facilities personnel and every effort is being made to replace this transformer with a new unit during the August shutdown. The transformer does not present an electrical shock hazard to building occupants. Contact Dave Smith, 463-3433.

August 10, 2009
UTILITY SHUT DOWN SCHEDULED FOR AUGUST 21, 22, AND 23, 2009
Water will be shutdown in Building 1 on August 21. Electricity will be shut down in Building 1 on August 22 and 23. Contact Mark Richardson, 463-3426.

PROJECT 448 KEYLESS ACCESS
Allied Fire & Security continued work in Building 1 Student Services, Building 8 Welding, and Building 4 Health. Dave Smith, the project coordinator, met with representatives of Building 1 to discuss their requirements for access and gave a presentation of the system to public safety. Meetings will continue until all the campus buildings have been reviewed and requirements established. Electricians are installing conduit in multiple buildings on campus. 25% of the infrastructure is complete. Contact Dave Smith, 463-3433.

PROJECT 451 UTILITY SUBMETERING
EMK is currently working on installing irrigation meters throughout the campus. On August 7, water and gas services will be shut off. for Buildings 3, 9, 15, and 16. Power will be shut down on August 7 from 7:00 a.m. – 7:00 p.m. in Buildings 1, 2 and Center. Contact Mark Richardson, 463-3426.

July 28, 2009
Project 448 Keyless Access Project

Allied Fire & Security continued work in Student Services, Auto/Diesel, and Child Care. Meetings with individual departments will continue for several weeks until all the campus buildings have been reviewed and requirements established. Contact Dave Smith at 463-3433.

July 21, 2009
PROJECT 448 KEYLESS ACCESS PROJECT

Allied Fire & Security are continuing work in Student Services, Auto/Diesel, and Child Care. Meetings with individual departments will continue for several weeks until all the campus buildings have been reviewed and requirements established. Contact Dave Smith, 463-3433.

July 14, 2009
PROJECT 448 KEYLESS ACCESS PROJECT

Allied Fire & Security began work in Building 1 Student Services, Building 9 Auto/Diesel, and Buildings 24-27 Child Care. A presentation was given to the Executive Team on July 9 to review the keyless access system planned for the campus. Much valuable guidance was received from this committee on policy related questions. Meetings with individual departments will continue for several weeks until all the campus buildings have been reviewed and requirements established. Contact Dave Smith, 463-3433.

July 7, 2009
PROJECT 448 "KEYLESS" DOOR ACCESS

Allied Fire & Security began work in Building 1, Student Services. Meetings will be established with Academic Deans and Departmental leadership to review the access controls planned for each building. These meetings will continue for several weeks until all the campus buildings have been reviewed and requirements established. Work on this project is scheduled to be “substantially complete” by December 31, 2009. Contact Dave Smith at 463-3433.


>> Return to Lane's Homepage     >> Return to Facilities Management and Planning Main Page     >> Return to top of page

Lane Community College - Facilities Management and Planning - Building 7, Room 204
4000 East 30th Avenue, Eugene, OR 97405 - (541) 463-5216
Please direct comments about this site to mckeans@lanecc.edu
Revised 6/22/10 (llb)
© 1996-present Lane Community College